Swan Pond Circle Road Lane ClosingSubmitted by WhitesCreek on March 16, 2010 - 6:09pm.
March 16, 2009 Update from the Kingston Fly Ash Recovery Site To Members of the Roane County CAG: TVA Will Build By-pass for Swan Pond Circle Road just north of the plant As part of the continuing cleanup efforts at the Kingston ash spill recovery site, employees will begin work on the Swan Pond Embayment restoration. In an effort to remove ash from the embayment safely and efficiently, TVA will build a bridge on the current road with plans to haul ash out under the bridge, thereby keeping trucks off of the road. In order to build the bridge, TVA will need to route traffic off of the current road. We will soon be building a by-pass road just off of the current Swan Pond Circle Road so that traffic does not have to go completely around the Circle. The by-pass road will be constructed first, followed by construction of the bridge. The bridge construction work is expected to take about 6 – 8 weeks. When the bridge work is complete, the by-pass road will be removed and Swan Pond Circle Road will be reopened. TVA to Temporarily Close One Lane of Swan Pond Circle Road In order to ensure adequate stability of the embayment area for heavy equipment use during the removal of the ash and additional road construction, TVA will conduct drilling on and around Swan Pond Circle Road. While conducting this work, beginning the week of March 21, one lane of a small section of Swan Pond Circle Road will be closed during working hours for two to three days. Road signs and road crews will direct traffic to protect vehicles on the road and workers performing the drilling operations. At the end of each workday, all equipment will be moved from the roadway, and two-lane traffic will be restored. Wet to Dry Ash Storage As you are now aware, there is a public meeting tonight to discuss a conversion from wet storage of coal ash to dry storage. There will be some site preparation work beginning on the south end of the plant site in the next week. You may see trucks hauling rail ties and other materials to appropriate disposal sites. We will update you as we receive more information on this project. Road Closings to Reduce Significantly The rail spur construction on the Ash Recovery Site is almost complete. As of today, about 60% of the road closings due to railcar switches have been eliminated and all closings due to switching will be eliminated by the end of the week. Only full and empty ash and coal trains will cause road closings on Swan Pond Road going forward. These typically run in the early morning and in the evening. Please don’t hesitate to call Katie Kline or me with any questions. Jane Greenwalt
|
New DiariesBrother WebsitesOther "Views":
• Blountviews • KnoxViews • TennViews • Whites Creek Journal Local Interest: • Princess Theater • Roane Heritage Com • Roane State • RoaneTNHistory.org • Swan Pond Community • Tamke Allen Obsv • TCASN Folks that Help: • EPA Kingston Site • Roane CAG • SOCM • SRSS • TCWN • West Roane Progressiveness: • All Hat No Cattle • American Progress • Campaign for America's Future • Daily KOS • digby • Liberadio • NoChaser • Paul Krugman • Talking Points Memo • TooFunny • Whitehouse.gov Local News Media: • Roane County News • Today's Local Weather Local Government: • City of Harriman • City of Harriman Code • City of Kingston • City of Kingston Code • City of Oliver Springs • City of Oliver Springs Code • City of Rockwood • City of Rockwood Code • Cong. Lincoln Davis • Rep. Dennis Ferguson • Roane County • Roane Schools • St. Sen. Ken Yager Candidates: • Democracy for Tennessee • Lincoln Davis for Cong. • Roane County Democratic Party • Roane TNDP • Roy Herron • TN Dem Party News • TN Democratic Party Upcoming events
|
Does this mean that ash will be stored on the Kingston side of the plant now?
The ash will be stored in the same footprint as the failed cell plus the upper settling pond. The last pond is called the stilling pond and will remain in service until the plant is converted to a dry ash handling system.
I don't understand what site preparation work in being done on the South (Kingston) side of the plant. Could you please clarify what they are talking about. What are they preparing a site for on that side in the next week if it is not ash storage?
I'm not sure what you are concerned about but there is a project relating to the gypsum pond that is currently on going. That is on the Kingston side of the facility. Could that be what you are relating to?
I'll try to explain. Under the heading:
Wet to Dry Ash Storage
It says:
That makes me think some type of site preparation, concerning ash storage, is going to take place next week on the Kingston side of the plant. Am I not reading it correctly? Are they talking about something other than ash storage?
I don't think so. The CAG asked for a presentation on the conversion to dry handling and storage sometime back. We want to know what the concerns are for safe handling and how dust will be controlled. This presentation should have answered those questions.